High Standard Construction of Geotextile

133 views 0 replies
Reply to Topic
juniperqq

Age: 2023
Total Posts: 19
Points: 10

Location:
https://www.chinahengzesteel.com/ppgi-corrugated-roofing-sheet/,
The long fibre filament needle punched geotextile in stock produced by geotextile manufacturers have certain technical requirements during construction. Only
when certain requirements are met can the construction be carried out smoothly.
What are the main technical requirements for filament geotextiles?
 
The geotextile manufacturers will explain in detail to everyone: the base surface of the filament geotextile must be
cleaned according to the design requirements during construction. This is the
key to ensure the anti-seepage effect. In addition, the base surface is not
allowed to have local unevenness. The base surface should be tightened with a
tamper or a seesaw to make it compact.
 
When laying a filament geotextile, the long fibre filament needle punched geotextile in stock must be laid from the bottom
up. The filament geotextiles and the film and the base surface should be
flattened tightly, but it is not appropriate to make the geotechnical Brazzle
too tight. Generally, it should be slightly looser, because the filament
geotextile is thin and light, after paving, Before the protective layer is
laid, it is easy to be blown by the wind, so the laying area should not be
large, and it is best to cover the protective layer of earth material. Of
course, the construction size of the filament geotextile can be customized
according to the needs of different customers. However, when the puncture or
tear of the long fibre filament needle punched geotextile in stock is found, it
must be pasted with the geotextile glue of three times the damaged area.