Furniture Rearranged as Mullins Library Prepares for Renovation

238 views 0 replies
Reply to Topic
freemexy

Age: 2023
Total Posts: 0
Points: 10

Location:
,
Furniture Rearranged as Mullins Library Prepares for Renovation
Tables and chairs are being moved from the west side of levels three and four of Mullins Library to levels one and two to make room for the removal of bookshelves, which will begin Feb. 4 and is expected to take several weeks. The majority of the move will be completed overnight to minimize disruptions during the day. At this time, there is not a firm date on which construction is set to begin. library reading room furniture
Study tables and chairs formerly located on the west side of levels three and four have been primarily moved to level one, with a few being added to level two near the Hodges Reading Room. Furniture on the east side of levels three and four is expected to remain in place. An additional study area has been made available in room 403, which was previously home to the Libraries' Digital Service Unit.
Posted 10 Jul 2019

Reply to Topic