Check The Main Bearing Hydraulic Station

67 views 0 replies
Reply to Topic
kmei4545

Age: 2023
Total Posts: 0
Points: 10

Location:
,
The daily inspection of the ultrafine vertical mill requires the on-the-job personnel to be familiar with the structure and performance of the equipment and the names, specifications and functions of each component, and inspect the ultrafine vertical mill in accordance with the inspection standards and the time and items specified in the inspection card, and make records.Check whether the air compressor pressure is normal , Whether the operation is normal, whether the motor voltage and current are normal, whether the motor is overheated, whether the air duct leaks, etc. Vertical roller mill lubrication replacement requirements table serial number lubrication point lubrication method lubricating oil standard number oil change period 1 main bearing splash lubrication Winter: 46 # mechanical oil summer: 68 # mechanical oil 6-12 months 2 ultrafine vertical mill size gear oil pool splash lubrication 220 # heavy Load industrial gear oil 6-12 months 3 reducer gears and bearings splash lubrication 18 # hyperbolic gear oil 6-12 months 4 motor bearing oil gun 3 # ordinary lithium grease 6-12 months 5 pinion bearing oil gun 3# Ordinary lithium base grease 6-12 months inspection content.
Posted 22 Aug 2022

Reply to Topic