construction of the wooden floor pavement

343 views 3 replies
Reply to Topic
xiao1236

Age: 2023
Total Posts: 0
Points: 10

Location:
,
Floor pavement more attention to the attention of three children to prevent the quality of home improvement process, the different construction of the main body is a close relationship between the upstream and downstream, after the construction of a link in the quality of the previous link established above. For example,the floor of the pavement to be carried out in the latter part of the project, if the decoration team did not provide a good ground conditions, it will inevitably lead to engineering quality problems. Ruijia floor, general manager of the company Yuan Yide ** statement, the details of the company's construction workers to guard against the specific
risks of construction practices. Note 1: Before the construction of the wooden floor pavement, the need to pay attention to the problem include: the ground dry, not back to the tide; floor installation within ten days before the ban on the ground sprinkler; cement mortar leveling the ground, ventilated 30 days after the installation of the floor.
Related links:
make planter from composite decking

fencing wall design

building over composite wood floors

Posted 24 Mar 2017

Reply to Topic