2000 years ago: large-scale intermittent asphalt mixing plant into China. Large batch of asphalt mixing plant into China, it is accurate from the 1988 road construction machinery in Xi'an to introduce the British PARKER LB1000 start. The original product is only a model built by the West LB1000, the product is very widely sold in the country, as large-scale intermittent asphalt mixing plant procurement of the best choice.
In 1992, the "five vertical and seven horizontal" national trunk line planning began to implement, for our highway continued, fast and healthy development has laid a solid foundation, then Shen Da, west, Jingjintang, Chengdu, Chongqing, Jiqing, Beijing A large number of important regional impact of the highway project have launched. Driven by the national highway construction policy, the domestic provinces have set up their own highway construction team.
At the same time a large number of foreign brands of asphalt mixing plant to enter the Chinese market, Maliani, Biening Hefei, Lin Tai Court, ACP, Niigata, Tanaka, Astrak and other brands, are this period into China. Domestic road construction equipment manufacturers are also mushroomed development, these enterprises through the introduction of technology, self-innovation, and gradually in the market a firm foothold.
This stage of the large-scale intermittent asphalt mixing station standard are four cold silos, four hot silos, diesel burners, dust collector in the early optional. Domestic models are mainly built in the West LB1000 type, after 1993, the import of equipment to 2000-based. Control through the AC contactor and intermediate relay to achieve, the control room is 2 people can operate the console, dense control buttons, display the instrument everywhere, even if the professional manufacturers of control circuit boards are also intermediate relay.
heavy asphalt repair machinerypatching concrete cracksrepair cracks in concrete drivewayconstruction equipment movers